Every pipe has a purpose.
Steam, water, compressed air, refrigeration, effluent treatment and power — sized to the whole plant from a load schedule, with room left to grow.

Is this for you?
Lines are defined and you need the plant room designed: what capacity of each utility, where it sits, and how it reaches every machine.
What is included
- Utility load schedule from each machine and process
- Steam generation and distribution
- Water sourcing, treatment and storage
- Compressed air with the quality the product needs
- Refrigeration and cold storage loads
- Effluent treatment sized to water use
- Power demand and distribution requirements
How it runs
Four steps, each ending in a document.
- 01
Load schedule
Demand of every consumer, with operating hours and peaks.
Hands overUtility load schedule
- 02
Diversity
How much runs at once, so equipment is not oversized.
Hands overPlant room layout
- 03
Size
Capacities set with a margin for growth.
Hands overUtility equipment specifications
- 04
Route
Plant room layout and distribution to the lines.
Hands overDistribution scheme
A question we hear
Why size utilities after the process?
Utility demand comes from the machines and the process. Sizing them first usually means guessing — and paying for it later.
Planning a food plant? Start with a drawing.
Tell us the product, the capacity you have in mind and where the land is. We’ll come back with how we would approach the detailed project report, at no cost.