05 · Utilities

Every pipe has a purpose.

Steam, water, compressed air, refrigeration, effluent treatment and power — sized to the whole plant from a load schedule, with room left to grow.

Food factory plant room with a steam boiler, pumps, air compressor, refrigeration skid and colour-coded pipelines

Is this for you?

Lines are defined and you need the plant room designed: what capacity of each utility, where it sits, and how it reaches every machine.

What is included

  • Utility load schedule from each machine and process
  • Steam generation and distribution
  • Water sourcing, treatment and storage
  • Compressed air with the quality the product needs
  • Refrigeration and cold storage loads
  • Effluent treatment sized to water use
  • Power demand and distribution requirements

How it runs

Four steps, each ending in a document.

  1. 01

    Load schedule

    Demand of every consumer, with operating hours and peaks.

    Hands overUtility load schedule

  2. 02

    Diversity

    How much runs at once, so equipment is not oversized.

    Hands overPlant room layout

  3. 03

    Size

    Capacities set with a margin for growth.

    Hands overUtility equipment specifications

  4. 04

    Route

    Plant room layout and distribution to the lines.

    Hands overDistribution scheme

A question we hear

Why size utilities after the process?

Utility demand comes from the machines and the process. Sizing them first usually means guessing — and paying for it later.

Go deeper · 6 min readSizing utilities: steam, water, air and cold
Next stage · 06Commissioning and product standardizationThe machines are installed.

Planning a food plant? Start with a drawing.

Tell us the product, the capacity you have in mind and where the land is. We’ll come back with how we would approach the detailed project report, at no cost.