04 · Project management

Engineers on your side through construction.

Coordination of civil work, erection and installation, so the plant is built the way it was drawn and the line goes in without surprises.

Steel frame of a new food factory going up, a crane lifting a purlin, machine foundations and a site table with drawings and schedule

Is this for you?

Construction and installation are about to begin and you want an experienced team coordinating vendors, checking work and keeping the schedule honest.

What is included

  • Project schedule and progress tracking
  • Coordination of civil, structural and services contractors
  • Vendor coordination for machinery delivery and erection
  • Site supervision during installation
  • Checks against layout and specifications
  • Issue resolution between disciplines

How it runs

Four steps, each ending in a document.

  1. 01

    Plan

    A schedule that follows the order of the work: foundations, structure, equipment, enclosure.

    Hands overProject schedule

  2. 02

    Coordinate

    Regular coordination between contractors and machinery suppliers.

    Hands overProgress reports

  3. 03

    Supervise

    Site checks during erection and installation.

    Hands overInstallation checklists

  4. 04

    Prepare

    Readiness checks before the plant moves to commissioning.

    Hands overCommissioning readiness report

Drawings the builders work from

Building plans, elevations, sections and structural details, issued for approval before the site work starts.

Main shed: plans, elevations and sections
Main shed: plans, elevations and sectionsWall heights, panel walls, canopies, sections through the frame and the door schedule for the process shed.
Office and quality lab building
Office and quality lab buildingElevations, sections, floor plans, beams and foundation details for the admin and QC block.

The order of the work on site

Typical sequence · illustrative durations
Site and foundations
Structural steel
Machinery delivery
Erection and installation
Utilities and piping
Building enclosure
Pre-commissioning checks
Ready for commissioning
Month 036912
Fig. — Project management keeps the sequence honest: foundations, steel, machinery, enclosure and utilities overlap only where the drawings allow it.

A question we hear

Do you replace the contractor?

No. Contractors build; we coordinate and check on your behalf.

Next stage · 05UtilitiesThe process lines are defined.

Planning a food plant? Start with a drawing.

Tell us the product, the capacity you have in mind and where the land is. We’ll come back with how we would approach the detailed project report, at no cost.