The weeks between installation and commercial production decide how quickly a new plant starts paying for itself. Rushed commissioning shows up later as quality complaints, unplanned stoppages and output that never reaches its rated figure.
Six gates
Commissioning works best as a series of gates. The plant moves to the next step only when the checks of the previous one are closed and written down.
Mechanical completion
Everything installed as drawn, with guards, earthing and safety devices in place.
Dry run
Motors, directions of rotation, interlocks and controls tested without product.
Water trial
Leaks, flows, temperatures and cleaning systems tested with water before food is involved.
Trial batches
Real product, small quantities, with every setting recorded so that what works can be repeated.
Performance
The line run at its rated output for long enough to show that output and quality hold together.
Handover
Standard operating procedures, training and documents handed to the team that will run the plant.
Product standardization
Alongside the machines, the product itself has to be fixed: ingredients, quantities, process times and temperatures, and the checks that confirm each batch. This is what lets a plant deliver the same product on its hundredth day as on its first.
Who should be in the room
- Machinery suppliers, for their equipment.
- The client's operating team, who will run the plant afterwards.
- An engineer coordinating the sequence and recording the results.